Senior Pursuit Specialist
📍 Stantec • Calgary, AB, Canada
Transmission Line Engineer
📍 Stantec • Edmonton, AB, Canada
Project Technical Lead/Design Manager - Water/Wastewater
📍 Stantec • Waterloo, ON, Canada
Intermediate Municipal Engineer
📍 Stantec • Dartmouth, NS, Canada
Construction Inspector
📍 Stantec • Ottawa, ON, Canada
Chargée / Chargé de projet, portuaire et maritime
📍 Stantec • Longueuil, QC, Canada
Senior Geotechnical Engineer - Dams, Reservoirs, and Hydropower
📍 Stantec • Winnipeg, MB, Canada
Senior Electrical Engineer
📍 Stantec • Winnipeg, MB, Canada
Transmission Line Engineering Team Lead
📍 Stantec • Waterloo, ON, Canada
Ingénieure / Ingénieur - Conception d'infrastructures de génie civil
📍 Stantec • Montréal, QC, Canada
Geotechnical Engineering Technologist
📍 Stantec • Calgary, AB, Canada
Ingénieur.e – Coordination principale de la surveillance, Bagotville
📍 Stantec • Trois-Rivieres, QC, Canada
Construction Manager - Wastewater Treatment
📍 Stantec • London, ON, Canada
Geotechnical & Materials Technician
📍 Stantec • Fredericton, NB, Canada
Ingénieure / Ingénieur électrotechnique et mobilité intelligente
📍 Stantec • Montréal, QC, Canada
Urban Planner
📍 Stantec • Waterloo, ON, Canada
Intermediate Environmental Planner
📍 Stantec • Calgary, AB, Canada
Commissioning Consultant
📍 Stantec • Ottawa, ON, Canada
Geotechnical Engineer (Intermediate) – Cold Regions and Permafrost
📍 Stantec • Fredericton, NB, Canada
Transmission Line Engineer
📍 Stantec • Halifax, NS, Canada
Chargée / Chargé de projet en surveillance, Ponts et ouvrages d'art
📍 Stantec • Laval, QC, Canada
Ingénieure-Ingénieur, Commande et protection
📍 Stantec • Trois-Rivieres, QC, Canada
Site Inspector, Field Ambassador, Water/Wastewater
📍 Stantec • Brampton, ON, Canada
Chargée ou Chargé de projet en structure de télécommunications
📍 Stantec • Laval, QC, Canada
Cheffe / Chef d’équipe, Infrastructures urbaines
📍 Stantec • Chicoutimi, QC, Canada
Fire Alarm Designer
📍 Stantec • Markham, ON, Canada
Transportation Technician or Technologist
📍 Stantec • Burnaby, BC, Canada
Senior Project Manager/ Technical Lead, Conveyance
📍 Stantec • Stoney Creek, ON, Canada
CPI, surveillance ponts et ouvrages d'art
📍 Stantec • Montréal, QC, Canada
Senior Civil, Structural, Architectural Estimator
📍 Stantec • Oakville, ON, Canada
Ingénieure-Ingénieur, Commande et protection
📍 Stantec • Longueuil, QC, Canada
Intermediate Electrical Engineer- Water
📍 Stantec • Calgary, AB, Canada
HSSE Advisor - (French Bi-lingual)
📍 Stantec • Dartmouth, NS, Canada
Senior BIM Manager
📍 Stantec • Whitehorse, YT, Canada
Canada West Alternative Project Delivery Lead
📍 Stantec • Calgary, AB, Canada
Chargée / Chargé de projet, Traitement des eaux
📍 Stantec • Longueuil, QC, Canada
Conseillère - Conseiller sénior, Marketing
📍 Stantec • Longueuil, QC, Canada
Geotechnical Engineer (Intermediate) – Cold Regions and Permafrost
📍 Stantec • Fort Mcmurray, AB, Canada
Principal Mechanical Engineer - Buildings
📍 Stantec • Edmonton, AB, Canada
Intermediate / Senior Field Technician - Newfoundland
📍 Stantec • St. John'S, NL, Canada
Geotechnical Engineer (Intermediate) – Cold Regions and Permafrost
📍 Stantec • Charlottetown, NL, Canada
Technicienne / Technicien, gestion documentaire
📍 Stantec • Québec, QC, Canada
Transmission Line Engineer
📍 Stantec • Waterloo, ON, Canada
Junior Document Controller
📍 Stantec • Calgary, AB, Canada
Bridge Engineer
📍 Stantec • Kelowna, BC, Canada
Distribution Design Team Lead
📍 Stantec • Regina, SK, Canada
Civil Designer
📍 Stantec • Saskatoon, SK, Canada
Canada West Alternative Project Delivery Lead
📍 Stantec • Burnaby, BC, Canada
Senior BIM Manager
📍 Stantec • Saskatoon, SK, Canada
Supervising Engineer for OSIM Inspections
📍 Stantec • Canada, ON, Canada