Full time permanent Posted June 02, 2026
Apply Now

Job Description


Would you like to work for an inclusive and collaborative company which is also one of the most successful within the UK infrastructure industry?


Metrowest 1b Scheme – Portishead to Bristol Temple Meads


Role Overview


The Metrowest 1b scheme will reinstate passenger rail services between Portishead and Bristol Temple Meads, improving regional connectivity and supporting sustainable transport.
This £80m programme includes:


 



  • Construction of 4.5 km of disused railway between Pill and Portishead

  • New stations at Pill and Portishead

  • Highways and utility works

  • Rock stabilisation and drainage

  • Bridges, retaining walls, and other lineside civils
    Delivery is planned from January 2026 to mid-2028 in collaboration with Network Rail.


 


Role Responsibilities

Apply for This Position

Ready to take the next step? Click the button below to submit your application.

Submit Application