Full-time Posted June 20, 2026
Apply Now

Job Description

This post links directly to the Green Job post. Click to see the job post in a new tab.Gold Group - England - Site Operator - Kent Plant Information: Waste Source: Layer Manure Technology: Anaerobic digestion in conjunction with CHP and biomethane production Electricity Capacity: up to 500KW Thermal Energy Capacity: up to 500KW Biomethane production capacity up to 6MW Site Operator The site operator will be part of the operations team at the waste-to-value biogas plant. The site operator will be the hands-on personnel on site to ensure the plant runs smoothly and output# Site Operator - Renewable EnergyGold Group - England - Site Operator - Kent Plant Information: Waste Source: Layer Manure Technology: Anaerobic digestion in conjunction with CHP and biomethane production Electricity Capacity: up to 500KW Thermal Energy Capacity: up to 500KW Biomethane production capacity up to 6MW Site Operator The site operator will be part of the operations team at the waste-to-value biogas plant. Th...

Apply for This Position

Ready to take the next step? Click the button below to submit your application.

Submit Application